DRY ONION
NUTRITION PROGRAM

Dry Onion Nutrition Program

If There Is a Structural Problem in the Soil;

If organic matter deficiency, high pH, or nutrient fixation is detected as a result of soil analysis;

Before basal fertilizer application, apply 2–4 liters per decare of DERMAN-S by spraying onto the plant projection area.

Before basal fertilizer application, apply 2–4 liters per decare of HUMDEX by spraying.

If low pH is detected, recommendations will be made according to the soil analysis.

Basal Fertilizer Application

Fertilizers whose types and quantities are determined by soil analysis should be applied in February and incorporated into the soil.

1st FOLIAR APPLICATION

Inter-row cultivation period – when shoots reach 10 cm

PRODUCTS TO BE USED

1 liter Master Effect per 100 liters of water

250 cc Zenova per 100 liters of water

2nd APPLICATION PERIOD

Bulb enlargement period

PRODUCTS TO BE USED

1 liter Master Effect per 100 liters of water

500 cc Combi per 100 liters of water

500 cc Master K per 100 liters of water

3rd APPLICATION PERIOD

Bulb enlargement period

(20–25 days after the previous application)

PRODUCTS TO BE USED

1–2 liters Master Effect per 100 liters of water

500 cc Master K per 100 liters of water

Promotional Video